Seven Gates Indonesia
Past Project

Lotte Chemical Indonesia

Dredging Sea Water Intake/Outfall Area
Project area

Approximately 4 Ha

Located in

Cilegon, Banten

Dredging depth

-7.00 m to -18.0 m

Dredging volume

124,372.61 m³

Project duration

11 June – 31 Oct 2023

PT Seven Gates Indonesia carried out dredging and dumping works for PT Lotte Chemical Indonesia at the Sea Water Intake/Outfall Area and Lighters Wharf. The project covered approximately 4 hectares with dredging depths from -7.00 metres to -18.0 metres, reaching a total volume of 124,372.61 cubic metres. The project is located at Jl. Raya Merak Km. 116, Cilegon, Banten, and was scheduled from 11 June to 31 October 2023.

Lotte Chemical Indonesia

Download
Company Profile