Lotte Chemical Indonesia

Dredging & Disposal Works — Intake Pit Package 7
Project duration

26 Nov – 8 Dec 2023

Located in

Cilegon, Banten

PT Seven Gates Indonesia carried out dredging and disposal works for the LINE Project Package 7 in front of the Intake Pit for PT Lotte Chemical Indonesia. The works deepened the Intake Pit serving the cooling water facilities, moving a total volume of 4,555,665 cubic metres. The project ran from 26 November to 8 December 2023 in Cilegon, Banten.