Past Project
Lotte Chemical Indonesia
Dredging Berthing Jetty Area
Project area
Approximately 52.9 Ha
Located in
Merak, Banten
Dredging depth
-18.00 m to -15.5 m
Dredging volume
1,698,033 m³
Project duration
19 Oct – 7 Nov 2022
Partner / Subcontractor
Jan De Nul
PT Seven Gates Indonesia takes pride in its partnership with PT Lotte Chemical Indonesia for the LINE Project WP7. We provided top-notch dredging and disposal services at the Jetty Area, covering an expansive area of approximately 52.9 hectares. With a design depth ranging from -18.00 meters to -15.5 meters, we skillfully dredged a total volume of 1,698,033 cubic meters. Situated in Merak, Banten, the project involved subcontractor Jan De Nul, running successfully from 19 October to 7 November 2022.