Project duration

1 Apr – 25 Dec 2026

Located in

Cilegon, Banten

PT Seven Gates Indonesia delivered shore protection works at Jetty A along the coastline (Phase 3 & 4) for PT Chandra Asri Pacific. The scope covered rock and tetrapod installation along 130 metres at the Chandra Asri Petrochemical plant jetty, including shotcrete installation. The works ran from 1 April to 25 December 2026 in Cilegon, Banten.